Raypak Boiler B User Guide |
Looking for: Raypak h3 boiler manual - Click here to DOWNLOAD Raypak H3-HD Installation Manual.Raypak Raytherm HB Manuals | ManualsLib The regulator should be placed a minimum distance of 10 times the pipe diameter upstream of the boiler gas controls. The pressure at the gas valve outlet tap, measured with a manometer,while in operation should be 3. If an adjustment is needed, turn the adjustment screw clockwise to increase pressure or counter-clockwise to lower pressure. Safety wiring must be N. Class 1. Boiler must be electrically grounded as required by N. In Canada, C. The voltage is indicated on the tie-in leads. Verify circuit breaker is properly sized by referring to boiler rating plate. A dedicated circuit breaker should be provided. Turn off all power to the boiler. Verify that power has been turned off by testing with a volt-ohm meter prior to working with any electrical connections or components. Observe proper wire colors while making electrical connections.
Comments
Post a Comment