The regulator should be placed a minimum distance of 10 times the pipe diameter upstream of the boiler gas controls. The pressure at the gas valve outlet tap, measured with a manometer,while in operation should be 3.

If an adjustment is needed, turn the adjustment screw clockwise to increase pressure or counter-clockwise to lower pressure. Safety wiring must be N. Class 1. Boiler must be electrically grounded as required by N. In Canada, C. The voltage is indicated on the tie-in leads. Verify circuit breaker is properly sized by referring to boiler rating plate. A dedicated circuit breaker should be provided. Turn off all power to the boiler. Verify that power has been turned off by testing with a volt-ohm meter prior to working with any electrical connections or components.

Observe proper wire colors while making electrical connections. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing. Installer action is required to electrically enable your Hi-Delta boiler to operate after making the power conections.

Definition of Appliance Categories Boilers are divided into four categories based on the pressure produced in the exhaust and the likelihood of condensate production in the vent. Category I. A boiler which operates with a non-positive vent static pressure and with a vent gas tempera ture that avoids excessive condensate production in the vent. Support of Vent Stack The weight of the vent stack or chimney must not rest on the boiler vent connection.

Support must be provided in compliance with applicable codes. The vent should also be supported to maintain proper clearances from combustible materials. Use insulated vent pipe spacers where the vent passes through combustible roofs and walls. Refer to the latest edition of the National Fuel Gas Code for further details.

ANSI Z The negative draft must be within the range of -. Vent material must be listed by a nationally recognized test agency. Common venting systems may be too large when an existing unit is removed.

At the time of removal of an existing appliance, the following steps must be followed with each appliance remaining connected to the common venting system placed in operation, while the other appliances remaining connected to the common venting system are not in operation. The total length of the horizontal thru-wall exhaust vent system should not exceed seventy 70 feet in length.

If horizontal run exceeds 70 feet, an appropriately sized extractor must be used. To maintain proper operation pressure reading must be between -.

Each elbow used is equal to ten 10 feet of straight pipe. This will allow installation in one of the four following combinations. The direct vent cap cannot be installed in a well or below grade. The direct vent cap must be installed at least one 1 foot above ground level and above normal snow levels.

The Raypak supplied flue exhaust direct vent cap must be utilized. The total length of the thru-wall exhaust vent cannot exceed forty 40 feet in length for the flue outlet. This will allow installation in one of the three following combinations. The negative draft must be within the range of- 0. The vent material must be in accordance with the above instructions for vent materials. It must be installed directly on the boiler.

See Section B for correct clearances. Care must be taken when locating the outdoor unit because the flue gases discharged from the vent hood can condense as they leave the hood. Turn off the power and shut off the gas to heater. Heater as shipped 2. Slide the vent collar from kit over the collar on heater as shown in Fig. See Fig. Take four of the self-tapping screws from the kit and screw into the holes as shown in Fig.

Slide tinnerman clips over the small bracket as shown in Fig. Slide the collector over vent collar, aligning the holes over the openings in the tinnerman clips as shown in Fig. Take four of the screws from the kit and screw into the holes as shown in Fig. Slide the vent cap down into the vent collar as shown in Fig. Also see finished assembly below. Installation and service personnel are required to be licensed in some states.

Persons not qualified shall not attempt repairs according to these instructions. Mark the four holes through filter box for screw locations. Air intake collar Mount the filter box to the unit using four screws provided in the kit.

Install filter under filter box on top of air intake. NOTE: The filter media fits loosely in the filter box. Failure to do so may result in control damage, boiler malfunction, property damage, personal injury, or death.

This switch is located at the bottom right-front corner of the control compartment. When additional heat is needed, the combustion air blower starts to purge all air from the combustion chamber for about 15 seconds. On proof of air flow, the air proving switch closes and the igniter is energized, eliminating the fuel costs of maintaining a constant pilot. To assure safe operation, the gas valve cannot open until the pilot igniter is verified. A 3 second time delay prevents premature lockout due to temporary conditions such as power fluctuations or air pockets.

Safety and energy conservation are factors to be considered when setting the water temperature on the thermostat. Purge all air from the system using purge valve sequence. After system is purged of air, lower system pressure. Open valves for normal system operation, fill system through feed pressure. Manually open air vent on the compression tank until water appears, then close vent.

This can be normally be accomplished by opening a downstream valve. Disconnect all fan pressure switch tubings at plenum and connect manometer using a tee. Close all manual firing valves. Turn power on; Check manometers attached to fan pressure switches.

The readings should be 1. If not, adjust the air shutter on the blowers to attain the correct value. Make sure power is on. Replace thermostat, or repair wiring connections. If no 24V,. Follow lighting. If less than 25MV open circuit , re- place thermocouple. If between 35 MV, replace gas valve. If ignition. After problem is corrected push button to reset, or replace single-use type vent switch. After problem is corrected push button to reset or re- place single use type roll-out switch.

Check water. Check terminal connectors or replace sensor as re- quired. It will turn OFF when sensor temperature returns to the proper range.

 


Raypak – Documents



  WebTwo-stage (H3) - Standard. On/Off (H4) - Optional. Fuel. Natural Gas. Propane Gas. Design Certified ANSI Z/CSA Burner. Two-stage. Ultra-low NOx . WebBoilers & Water Heaters Warranty & Support Talk to Sales Documentation Where to Buy Home Documents Library RAYPAK’S INFORMATION CENTER DOWNLOAD . WebPRODUCT BETTER Access setup guides, manuals, tips and more FIND DISCONTINUED PRODUCTS WITH EASE Access setup guides, manuals, tips and more Whether you're .    


Comments

Popular posts from this blog

Chip download win 8.Interesting tutorials

Uploaded by - Ggundel.exe download free